Track systems

Railway Track System

We offer complete service for every stage of track system construction, implementing Arianna® innovative ballast-less systems to ensure a better future for next generations.

We are the first European company to carry out railway superstructure projects using the innovative Arianna®, a system composed by prestressed reinforced concrete prefabricated slabs, guaranteeing short intervention times.

Ballasted

30 YEARS

Lifecycle

290.000 m2

Land use
for each km of line

VS

Arianna®

90 YEARS

Lifecycle

27.400 m2

Land use
for each km of line

Savings obtained by replacing 1 km of traditional plant with 1 km
of Arianna ® system:

46%

Reduction of carcinogens

37

Football fields

109 tons

Reduction of carbon dioxide

Why to choose ARIANNA®?

  • Maintenance costs reduction
  • Short laying and installation times
  • Ensure a long-lasting project with a focus on durability
  • Guarantee a sustainable environmental impact
  • Create a line accessible to road vehicles

The birth of ARIANNA®

The first installations, with over 40 years of operation, has proven the efficiency of the system, which has been adopted by infrastructure operators in Italy and worldwide.

To this day, the Arianna® system has been installed on over 200 km of line.
WEGH is a pioneer in the implementation of ballast-less railway track systems based on Arianna® prestressed slabs. Later, WEGH carried our major interventions on important Italian railway infrastructure lines, such as the Scilliar Gallery or the Florence-Rome high-speed railway line. These slabs are laid on foundations with bedding mortar specifically designed and developed by WEGH, with CE marking.

Where is Arianna® placed?

  • Viaducts and tunnels, because it reduces maintenance costs
  • Stations, because it simplifies tracks cleaning

The Arianna® system is available in two different versions: the standard version, with characteristics higher than the traditional ballast, and the Plus version, designed for cases that require high performance to limit vibration.

1
Design
2
Production
3
Installation
4
Assistance

We support and collaborate with the client to choose the most suitable track system.

WEGH Group is one of the few companies in the world able to offer the customer all the necessary skills to carry out all phases of track system construction: design, production, installation and maintenance. And for each phase, we have the experience to provide assistance for the proper execution of the work on schedule.

Wegh group
Wegh group
Contact us
Contact us
https://www.weghgroup.com/wp-content/uploads/2024/07/pagina-successiva-2.jpg

Track systems

Tramway track systems

Tramway track systems