We offer innovative ballast-less track systems, for railway, tramway and metro projects, keeping an eye on ports and freight villages’ needs.

We follow the customer from the design phase of the track system, through online construction and providing assistance for routes in operation. We guarantee a complete and continuous support to ensure the optimal operation and durability of the system.

Ballast-less track system —

Ballast-less track system —

335

km of ballast-less track realised

42

years of experience

250

m of daily track laying

We offer innovative ballast-less solutions, with our Arianna® slab track system and Arianna® floating slab track system, besides offering, where required, on-site installations.

ADDED VALUES

Reliability

Reliability: the ability of our track systems to transfer vertical and horizontal loads in a consistent and durable way, while complying with technical specifications.

Availability

Availability: for the customer to dispose of the track and use it freely, without having to wait for maintenance work to be completed. Being available when required, considering both planned and unplanned outages.

Reduced maintenance

Reduced maintenance: WEGH has developed install-and-forget solutions, resulting in elimination of maintenance costs for the organisation and reduced life cycle cost of the equipment.

Safety

Safety: Our systems, designed in compliance with the main regulations, guarantee 100% security, risk mitigation and interoperability. This ensures that the system integrates with other systems and subsystems according to the highest safety standards.

Sustainability

Sustainability: We research sustainable materials and solutions to reduce the environmental impact and promote an environmentally friendly approach in the design and construction of track systems to ensure sustainable infrastructure for future generations.

Last news

synergy-between-the-plants-concrete-track-systems-elements-and-track-system-business-units

06.19.2024

WEGH Group: the synergy between the plants, concrete track systems elements and track system business units

  • Concrete elements for track system
  • Plants for track system element
  • Track systems

10.16.2022

Catania: completed the Lot 1 of the Nesima-Misterbianco section of the Circumetnea Railway using ARIANNA Slab Track

  • Track systems
  • Product

06.16.2021

WEGH GROUP WILL REALIZE BALLASTLESS ARIANNA® IN STORSTRØM BRIDGE IN DENMARK

  • Track systems
  • Product

06.26.2018

THE ARIANNA BALLASTLESS SLAB SYSTEM OF WEGH GROUP, WAS SELECTED TO ACCOMPLISH THE MODERNIZATION OF THE MARLENGO GALLERY